Note: Please do not post ads in the timeshare forums. If you want to add a timeshare posting, go here.

Original Message:

Re: How's the reconstruction coming along. (by Kate F.):

We were there twice last year and are going back in April and Christmas again. There is a lot of construction still. The Seaside Bldg is probably half done. I dont know what the official line is but it's viewable on the website (morritts.com). At Christmas they were still working on the outside so one has to assume they should be inside doing finishing work which takes a bit of time usually. The dock was not finished in December but looks like it's been sealed in and should be ready by the time we get there in April, hopefully. David's opened outside on the terrace in December while we were there with a buffet. They continue to do the nightly activities out by the pool at MTC and I actually found it to be more fun. There is plenty of room to sit and dance. All in all, we love it for what it is and the people, diving so are willing to watch it grow and continue to go there no matter what. The Grand is fabulous as usual--totally back to where it was pre-Ivan. No matter what, there's great diving, plenty to eat and drink and beautiful water and sand!