Note: Please do not post ads in the timeshare forums. If you want to add a timeshare posting, go here.

Original Message:

Re: Waikiki Beach Walk Renovation (by Susan Q.):

annec100 wrote:
Is the resort noisy with construction going on? How much construction is left to do?

Because Lewers St. is normally busy, the little bit of construction still going on, is not even noticed. The majority of the major constrution is finished. It's very nice!The only new constuction going on now, will be the Trump building. The land was cleared but no constuction was going on while I was there.